House of Veda

The Chemical Reactions of Mind

Archive for the ‘My 3D’ Category

Preview of my CG Works

Save Earth, Save Life

Posted by Anirudha on October 17, 2007

Struck this concept while reading a print article about global warming.

Its a very simple animation.

The presentation is much depended on the sounds in the background.

The concept was to unfold everything with sounds and complemented with visuals.
Running Time – 1 min 4 sec.
Production Time – 4 days.
Period – September 2007.

The Video

Screenshots

Posted in My 3D, My Works | Leave a Comment »

The Last Resort : An Experimental Short

Posted by Anirudha on October 17, 2007

This was the first work after a gap of almost 2 years.A short animation story between fighter jets and a warship.

Learnt a lot during its production and did this as full time work.

The trees are matte painted to save on rendering time.

Running Time – 2 min 16 sec.
Production Time – 45 days.
Period – June 2007.

The Video

Screenshots


The Images used for matte painting trees

Posted in My 3D, My Works | Tagged: , , , , , , | Leave a Comment »

FXWars CarCrash Challenge Entry – June 2005

Posted by Anirudha on October 17, 2007

CGtalk Fxwars carcrash challenge entry.
The challenge was to create real crash physics simulation.
The crash simualtion was achieved by creating a custom rig. The metal crash
was done with 3ds max cloth.

Total Production time – 10 days.
Period – June 2005.

Here’s the completed animation

A short Breakdown

Posted in My 3D, My Works | Tagged: , , , | Leave a Comment »

Storm Along the Road

Posted by Anirudha on October 17, 2007

A small storm animation using static image as background. It was done in a weekend.


Posted in My 3D, My Works | Tagged: | 1 Comment »

Pursuit Car Animation

Posted by Anirudha on October 17, 2007

First car modelling and animation.
Modelled two cars and the truck is a free model.
The cars are Nissan 350z and Mercedes SLK.
It’s an opening ceremony animation made for the college national annual event called “Pursuit”.

Total Production Time – 5 days.
Period – March 2005.


Posted in My 3D, My Works | 2 Comments »